The proposed Oklahoma Primary Aluminum smelter at the Tulsa Port of Inola is often described as an Inola issue.
But air doesn't stop at town boundaries. Treated industrial wastewater from the Port will enter the Verdigris River. Broken Arrow draws its raw drinking water from the same river only a few miles downstream. The electricity needed for the smelter would be supplied through PSO's regional system. And the project involves substantial federal, state and local public support.
The smelter is still proposed, and several permits and agreements remain under review.
This FAQ separates what’s documented today from what remains to be decided. 1. What’s being proposed? Oklahoma Primary Aluminum, or OPA, proposes to build a roughly $4 billion primary aluminum smelter at the Tulsa Port of Inola in Rogers County. The smelter is designed to produce up to 750,000 metric tons of primary aluminum each year, which would make it the largest primary aluminum smelter in the United States. OPA projects approximately 1,000 permanent direct jobs and about 4,000 construction jobs. 2. What is primary aluminum smelting? Primary aluminum is new aluminum produced from alumina rather than recycled aluminum. Alumina is dissolved in a fluoride-containing molten bath and aluminum is produced through electrolysis in large reduction cells commonly called pots. The process operates continuously and requires extraordinary amounts of electricity. Primary aluminum smelting also produces air emissions, wastewater and hazardous waste that are regulated under federal and state environmental laws. 3. Who would own the proposed smelter? OPA is a joint venture: Emirates Global Aluminium, or EGA: 60% Century Aluminum: 40% EGA is headquartered in the United Arab Emirates. Century Aluminum is a publicly traded U.S. company headquartered in Chicago. 4. Where would it be located, and what communities are nearby? The smelter would be built at the Tulsa Port of Inola, along the Verdigris River southwest of Inola. Inola, Fair Oaks and Tiawah are among the closest communities. Verdigris and Catoosa are also nearby. Coweta and Broken Arrow are farther away but remain part of the surrounding region, while Tulsa is part of the same broader airshed, economy and PSO service territory. A 10-mile circle should not be treated as an environmental boundary. Air pollution can travel farther depending on wind, weather and atmospheric conditions, and water moves downstream through the river system. 5. Has the smelter already been approved? Not yet. The Oklahoma Department of Environmental Quality is currently reviewing OPA's air-quality construction permit application. DEQ says additional permits may be required for water discharge, stormwater management, waste handling and disposal. The Town of Inola also has a heavy-industrial development moratorium in effect through April 7, 2027. 6. Why is this more than an Inola issue? Several potential impacts are regional. Air emissions can move into surrounding communities. Industrial wastewater from the Port will ultimately be discharged into the Verdigris River. Broken Arrow currently gets its raw drinking water from the Verdigris River at the Adams Creek confluence downstream of the Port. The smelter will also require roughly 1.2 gigawatts of continuous electricity, making it one of the largest individual electric loads in Oklahoma and tying it to regional generation, transmission and utility-rate decisions. 7. What pollutants would the smelter emit into the air? OPA's air-permit application includes emissions of pollutants such as: -hydrogen fluoride and particulate fluoride -particulate matter, including fine particles -nitrogen oxides -sulfur dioxide -volatile organic compounds -carbon monoxide -polycyclic aromatic compounds -hazardous metals and other hazardous air pollutants EPA specifically regulates primary aluminum smelters for hazardous air pollutants including hydrogen fluoride, carbonyl sulfide, polycyclic organic matter, lead, nickel, manganese, mercury and PCBs. The final allowable emissions remain under DEQ technical review. 8. Why is fluoride such a major concern? Fluoride is central to the aluminum-smelting process and has historically been one of the pollutants most closely associated with primary aluminum smelters. OPA says its modern technology will emit substantially less fluoride per ton of aluminum than older U.S. smelters. Its proposed permitting limit is 0.64 pounds of total fluoride per U.S. ton of aluminum produced.
The Inola smelter will be enormous. At OPA's planned production level, its own proposed permit ceiling works out to approximately 264 tons of fluoride compounds per year. A smelter can have a low emission rate per ton while still producing a large amount of pollution in total because it produces so much aluminum. For comparison, Norðurál's modern smelter in Iceland reported fluoride emissions of 0.34 kg per metric ton in 2025. At its 350,000-metric-ton permitted capacity, that rate would equal roughly 131 U.S. tons of fluoride per year. This illustrates the importance of looking at total annual emissions as well as emissions per ton. Fluoride also can move through several environmental pathways. The Agency for Toxic Substances and Disease Registry (ATSDR) is a federal public health agency within the U.S. Department of Health and Human Services and works closely with the CDC. Its job is to evaluate the health effects of exposure to hazardous substances and contaminated sites. ATSDR says hydrogen fluoride can be absorbed into rain, clouds and fog, while particulate fluorides can be removed from the air through wet and dry deposition onto land and surface water. 9. What air pollution concerns matter to people who don't farm or raise cattle? Fluoride's potential effects on vegetation, hay and livestock are important in rural areas, but regional air-quality concerns go well beyond agriculture. Fine particulate matter, or PM2.5, can penetrate deep into the lungs and can affect both the lungs and cardiovascular system. EPA links particle pollution with aggravated asthma, decreased lung function, respiratory symptoms, heart attacks and other health effects. Children, older adults and people with heart or lung disease are among the groups at greater risk. Ground-level ozone can cause coughing, shortness of breath and airway inflammation, and can aggravate asthma and other lung diseases. Children, people with asthma, older adults and people active outdoors are among those at greater risk. Nitrogen oxides and volatile organic compounds from industrial sources and power generation can react in sunlight to form ground-level ozone. 10. Why does ozone matter to Tulsa, Broken Arrow, Catoosa, Coweta and surrounding communities? The Tulsa metropolitan area already operates close to the federal ozone standard. Through November 8, 2026, the Tulsa area recorded nine ozone exceedance days in 2026. Its current three-year ozone design value is 0.070 ppm, which meets the federal standard but sits immediately below the 0.071 ppm level that constitutes a violation. Oklahoma DEQ says the state is currently designated in attainment with federal criteria-pollutant standards. That makes cumulative emissions important. OPA's preliminary modeling has placed the smelter's ozone impact just below the federal significant-impact threshold. The Attorney General's office described the estimate as within about 4% of that threshold. The proposed PSO power station near the Port would create an additional major source of nitrogen oxides and volatile organic compounds. Neither fact alone proves that the Tulsa region would violate the ozone standard. They do make careful cumulative air-quality analysis important in a region that already experiences ozone-exceedance days. 11. How far could smelter air pollution travel? There is no scientifically meaningful fixed radius. Pollution movement depends on stack height, emission rate, wind direction, wind speed, atmospheric stability, temperature, terrain and chemical reactions in the atmosphere. Some pollutants can travel many miles. Others deposit closer to their source. That is why air-permit review uses dispersion modeling rather than simply drawing a five-mile or 10-mile circle around a smelter. Residents of communities outside Inola therefore have a legitimate interest in the modeling assumptions and results. 12. What happens to wastewater from the smelter? OPA says it intends to recover and reuse most of the water entering the smelter and estimates that 5% to 8% of incoming water would leave as industrial wastewater. OPA says that wastewater will be pretreated at the smelter and then sent to the Tulsa Port of Inola wastewater system for additional treatment and disposal. The Port's existing wastewater planning calls for combined treated effluent to be piped approximately 1.5 miles south of the Port and discharged into the Verdigris River. The Port's long-range wastewater study was designed for up to 18.72 million gallons per day at full industrial-park buildout, including 6.6 MGD of non-cooling industrial wastewater and about 11 MGD of cooling water. OPA has not yet published a complete site water balance showing exactly how many gallons per day would enter the smelter. That makes its 5% to 8% figure impossible to convert into a precise OPA discharge volume today. An industry-based estimate is discussed in Question 15. 13. What pollutants could reach the Verdigris River even after treatment? Wastewater treatment is designed to reduce pollutants. It doesn't necessarily mean that every regulated pollutant is reduced to zero. Federal wastewater rules for primary aluminum smelting address different pollutants depending on the particular waste stream, including fluoride, aluminum, nickel, antimony, oil and grease, total suspended solids and benzo(a)pyrene. Some waste streams have zero-discharge requirements for particular pollutants while others have numerical limits. EPA's technical work on primary aluminum wastewater also identifies fluoride, suspended solids, oil and grease and other contaminants associated with smelting wastewater. A modern Icelandic smelter provides a useful real-world example. Norðurál monitors wastewater and drainage for fluoride, aluminum, suspended particles and oil or grease. The second pathway is through the air. ATSDR says hydrogen fluoride and particulate fluorides released into the atmosphere eventually deposit onto land or water through rainfall or dry deposition. Fluoride deposited on land can also reach surface water through runoff. Therefore, the river question involves both direct wastewater discharge and atmospheric deposition within the watershed. The actual concentrations reaching the Verdigris from OPA will depend on final permit limits, treatment design, operating performance, river flow and environmental conditions. 14. Why does this matter particularly to Broken Arrow? Broken Arrow's current primary raw-water source is the Verdigris River at the Adams Creek confluence. The city says this has been its raw-water source since 2014. Its Verdigris River Water Treatment Plant can produce roughly 30 million gallons per day of treated drinking water. Tulsa Ports' planned treated-effluent outfall is on the Verdigris at 36.097717, -95.558592. The Broken Arrow raw-water intake area is roughly two miles away in straight-line geography and only a few river miles downstream from the Port's proposed outfall. Broken Arrow has a direct interest in: -what pollutants OPA would send to the Port treatment system -the final discharge limits at the Port outfall -upstream monitoring -spill-response procedures -monitoring for fluoride, metals and other industrial contaminants -how Broken Arrow's treatment system would respond to unusual industrial releases Other communities in the region have different connections to the project. For Tulsa, Catoosa, Coweta and communities closer to Inola, air quality, ozone, electric-system costs and regional environmental effects may be more direct concerns than the specific Broken Arrow drinking-water pathway. 15. How much water might the smelter actually use and discharge? OPA hasn’t published enough site-specific information to answer this precisely. But an industry benchmark gives us a reasonable scale. The International Aluminium Institute reports an average water input for primary aluminum production of about 2.6 cubic meters per metric ton of aluminum, with net freshwater consumption of about 1.4 cubic meters per metric ton after water returned essentially unchanged is considered. Applied to a 750,000-metric-ton Inola smelter, that average would equal approximately: -1.95 million cubic meters of water per year -about 515 million gallons per year -about 1.4 million gallons per day of average water input If OPA's stated 5% to 8% wastewater figure were applied to that industry-average input, it would equal approximately 71,000 to 113,000 gallons of wastewater per day. Those numbers are an illustration, not OPA's published water requirement. Smelter water use varies enormously depending on cooling design. Norðurál's Iceland smelter, for example, reported only about 179,500 cubic meters of freshwater use in 2025, but its rectifier cooling system circulated about 7.9 million cubic meters of seawater. Inola obviously can’t duplicate a seawater cooling system. That’s why OPA should eventually provide a complete site water balance showing total withdrawals, water sources, cooling demand, recycling, evaporation and wastewater discharge. 16. What hazardous waste would the smelter generate? One of the best-known hazardous wastes from primary aluminum smelting is spent potliner. The carbon lining inside electrolytic pots eventually wears out and must be replaced. EPA classifies spent potliner from primary aluminum reduction as hazardous waste K088. K088 is EPA’s hazardous-waste designation for the spent carbon lining removed from aluminum reduction cells when the cells are rebuilt. The material can contain cyanide compounds, fluoride, metals and other contaminants and must be managed under federal hazardous-waste requirements. OPA says hazardous wastes would be managed under applicable federal and state requirements and transported to authorized off-site facilities. Questions worth tracking include how much K088 waste the Inola smelter would generate, how long it would be stored onsite, where it would be shipped and what backup arrangements will exist if disposal or recycling capacity became unavailable. 17. How much electricity would the smelter require? Century Aluminum CEO Jesse Gary has publicly described the power agreement being negotiated with PSO as approximately 1.2 gigawatts, or 1,200 megawatts. If that load operates continuously for a year, it will consume approximately 10.5 million megawatt-hours of electricity. For scale, published comparisons put that in the range of the electricity consumed by roughly 900,000 U.S. homes. Aluminum smelters require continuous power, so the issue is larger than simply connecting another industrial customer to the grid. Enough generation, transmission and fuel supply must be available to support that load reliably, even during PSO maintenance periods. 18. Is a new power station being proposed near the smelter? Yes. PSO has proposed the Inola Power Station, a natural-gas combined-cycle generating station near the Port with nominal capacity of about 1,282 MW. PSO's air-permit application for this Power Station calculates annual potential emissions including approximately: -390.5 tons of nitrogen oxides -123 tons of volatile organic compounds -200 tons of PM2.5 -68 tons of sulfur dioxide -5.26 million U.S. tons of greenhouse gases measured as CO2 equivalent The greenhouse-gas number is especially useful for understanding scale. Converting 5.26 million U.S. tons to metric tons and comparing it with EPA's estimate of 4.6 metric tons of annual CO2 emissions from a typical gasoline passenger vehicle works out to roughly the annual tailpipe CO2 emissions of one million passenger vehicles. The proposed power station would also emit NOx, VOC and particulate matter, pollutants relevant to regional ozone and respiratory health. 19. Could the smelter and new power infrastructure affect electric bills? There are two separate issues. On November 5, 2026, the Oklahoma Corporation Commission approved a PSO rate order that includes an overall 3.55% increase for residential customers. That was a broad PSO rate case involving grid investment, generation and other utility costs. The same OCC order created a new large-load tariff with separate rates, terms and conditions for customers using more than 75 MW. Regulators said the tariff is intended to protect residential customers from paying higher rates or interconnection costs caused by very large new customers. The proposed smelter's roughly 1,200-MW load would be about 16 times that 75-MW threshold. The remaining question is whether the eventual rate structure will fully assign the costs of new generation, transmission, substations, gas infrastructure and other investments needed for large-load customers to those customers. Critics of the recent rate decision remain concerned that some system costs associated with rapid large-load growth could eventually be shared with existing residential and small-commercial customers. The large-load tariff is intended to address that concern, but its effectiveness will depend on the final contracts, cost allocations and future OCC decisions. 20. How much public financial support is associated with the smelter? There isn't one useful grand-total number because the programs work differently and some overlap. The major pieces identified so far include: -U.S. Department of Energy: federal cost share of up to $500 million. DOE awarded $10 million for Phase 1 in January 2025. -Oklahoma ROA-25: $255 million of state principal is being placed into a financial structure designed to fund 15 annual manufacturer investment rebates. -Inola TIF districts: projected to generate up to $545 million in future property-tax, sales/use-tax and electric-franchise-fee increment. The plan identifies $429 million in project costs, including $270 million in development financing and $89 million in Port infrastructure. About $359 million, or 84%, of identified project costs go toward private development associated with the smelter or Port infrastructure supporting industrial development. -Manufacturing machinery and equipment sales/use-tax exemption: estimated in the 2025 state/EGA agreement at approximately $186 million. -Manufacturing energy sales/use-tax exemption: approximately $29 million. -Five-year manufacturing property-tax exemption: approximately $109 million. -Freeport inventory exemption: approximately $8 million per year. -Investment/New Jobs Tax Credit: approximately $155 million in projected Oklahoma income-tax offsets over 30 years. -Federal Section 45X production tax credit: qualifying primary aluminum can receive a credit equal to 10% of eligible U.S. production costs. Based on illustrative production costs, the benefit could be approximately $160 million-$200 million per full-rate year, although the credit begins phasing down after 2030 and ends after 2033. -Section 232 aluminum onshoring incentive: an approved U.S. expansion project can qualify for reduced tariffs on imported primary aluminum while new domestic capacity is being developed. Using Century's 40% share of the Inola project as an illustration, the tariff savings could be roughly $225 million-$262.5 million per year. -Proposed PSO power arrangement: the 2025 state/EGA agreement contemplated an estimated $16 million annual generation/transmission bond credit, an electricity-rate discount of up to 10%, and a long-term price hedge covering part of the smelter's power costs. The final PSO agreement is still being negotiated and would require regulatory approval. These programs include direct funding, tax credits and exemptions, redirected future tax revenue, tariff savings and potentially discounted electricity. Their timing and eligibility differ. THE ABOVE PROGRAMS TOTAL $2.172 BILLION DOLLARS IN SUBSIDIES. 21. What economic benefits are being promised? OPA projects: -at least 1,000 permanent direct jobs -approximately 4,000 construction jobs -average permanent compensation of about $100,000 -thousands of additional indirect and induced jobs across Oklahoma OPA's company-sponsored economic-impact study projects an average of about 7,000 Oklahoma jobs annually over the life of the project and approximately $1.45 billion in annual Oklahoma GDP contribution. These are economic projections. The appropriate public discussion is how those potential benefits compare with the public support, environmental impacts, infrastructure requirements and risks associated with the project.
THERE HAS BEEN NO STUDY OF JOB DESTRUCTION IN THE AGRICULTURAL MARKETS. 22. What legal and local decisions are still unresolved? Several important proceedings remain active. Oklahoma Attorney General Gentner Drummond filed a state-law lawsuit seeking to block the smelter. The case was returned from federal court to Rogers County District Court in September 2026, where it continues. The Town of Inola has a heavy-industrial development moratorium in place through April 7, 2027. On that date, eligible Town of Inola voters are scheduled to decide a citizen initiative that would prohibit primary aluminum smelting within town limits. Separate litigation involving Tulsa Ports and the Town also challenges local restrictions related to development at the Port. Meanwhile, the DEQ permitting process continues independently. 23. What can residents of surrounding communities do now? People don’t have to live inside Inola to participate in state and federal environmental and utility proceedings. Residents can: -Follow ODEQ's official Inola smelter page and sign up for updates. -Review OPA's air-permit application and DEQ correspondence rather than relying solely on statements from either supporters or opponents. -Participate in formal public-comment periods and public meetings. -Follow future water-discharge, stormwater and waste permits. -Follow Oklahoma Corporation Commission proceedings involving OPA's power contract, PSO's Inola Power Station and large-load rate treatment. -Ask Broken Arrow officials and water-system managers how they plan to monitor industrial discharges upstream of the city's Verdigris raw-water intake. -Ask officials in Tulsa, Catoosa, Coweta and other surrounding communities to review the regional air-quality implications, particularly ozone and particulate pollution. -Ask for cumulative analysis that considers the smelter together with new power generation and other large industrial development in the region. -ODEQ currently lists future technical meetings covering Best Available Control Technology and dispersion modeling, followed by a draft air-permit public meeting. Dates have not yet been announced. 24. Where can I get information directly from the sources? Oklahoma DEQ — Proposed Inola Aluminum Smelter Official permit documents, technical correspondence, meeting information and public-participation opportunities. ODEQ Inola Smelter Project Oklahoma Primary Aluminum — Answers Center The smelter developer's explanations of emissions, water, jobs, ownership and other issues. OPA Answers Center Broken Arrow — Verdigris River Water Treatment Plant Information on Broken Arrow's drinking-water treatment system. Broken Arrow Water Treatment Information Tulsa Area Air Quality Current regional ozone monitoring and annual scorecards. Tulsa Air Quality PSO Rates and Tariffs Current PSO tariff documents, including the November 2026 tariff package. PSO Rates and Tariffs The key point for surrounding communities is simple. This isn't only an Inola zoning question. The decisions now being made involve a major regional air-emissions source, treated industrial wastewater entering a river used for drinking water downstream, one of the largest proposed electric loads in Oklahoma, a new 1,282-MW natural-gas power station, and substantial public financial support. These decisions deserve attention from communities well beyond Inola.
This FAQ separates what’s documented today from what remains to be decided. 1. What’s being proposed? Oklahoma Primary Aluminum, or OPA, proposes to build a roughly $4 billion primary aluminum smelter at the Tulsa Port of Inola in Rogers County. The smelter is designed to produce up to 750,000 metric tons of primary aluminum each year, which would make it the largest primary aluminum smelter in the United States. OPA projects approximately 1,000 permanent direct jobs and about 4,000 construction jobs. 2. What is primary aluminum smelting? Primary aluminum is new aluminum produced from alumina rather than recycled aluminum. Alumina is dissolved in a fluoride-containing molten bath and aluminum is produced through electrolysis in large reduction cells commonly called pots. The process operates continuously and requires extraordinary amounts of electricity. Primary aluminum smelting also produces air emissions, wastewater and hazardous waste that are regulated under federal and state environmental laws. 3. Who would own the proposed smelter? OPA is a joint venture: Emirates Global Aluminium, or EGA: 60% Century Aluminum: 40% EGA is headquartered in the United Arab Emirates. Century Aluminum is a publicly traded U.S. company headquartered in Chicago. 4. Where would it be located, and what communities are nearby? The smelter would be built at the Tulsa Port of Inola, along the Verdigris River southwest of Inola. Inola, Fair Oaks and Tiawah are among the closest communities. Verdigris and Catoosa are also nearby. Coweta and Broken Arrow are farther away but remain part of the surrounding region, while Tulsa is part of the same broader airshed, economy and PSO service territory. A 10-mile circle should not be treated as an environmental boundary. Air pollution can travel farther depending on wind, weather and atmospheric conditions, and water moves downstream through the river system. 5. Has the smelter already been approved? Not yet. The Oklahoma Department of Environmental Quality is currently reviewing OPA's air-quality construction permit application. DEQ says additional permits may be required for water discharge, stormwater management, waste handling and disposal. The Town of Inola also has a heavy-industrial development moratorium in effect through April 7, 2027. 6. Why is this more than an Inola issue? Several potential impacts are regional. Air emissions can move into surrounding communities. Industrial wastewater from the Port will ultimately be discharged into the Verdigris River. Broken Arrow currently gets its raw drinking water from the Verdigris River at the Adams Creek confluence downstream of the Port. The smelter will also require roughly 1.2 gigawatts of continuous electricity, making it one of the largest individual electric loads in Oklahoma and tying it to regional generation, transmission and utility-rate decisions. 7. What pollutants would the smelter emit into the air? OPA's air-permit application includes emissions of pollutants such as: -hydrogen fluoride and particulate fluoride -particulate matter, including fine particles -nitrogen oxides -sulfur dioxide -volatile organic compounds -carbon monoxide -polycyclic aromatic compounds -hazardous metals and other hazardous air pollutants EPA specifically regulates primary aluminum smelters for hazardous air pollutants including hydrogen fluoride, carbonyl sulfide, polycyclic organic matter, lead, nickel, manganese, mercury and PCBs. The final allowable emissions remain under DEQ technical review. 8. Why is fluoride such a major concern? Fluoride is central to the aluminum-smelting process and has historically been one of the pollutants most closely associated with primary aluminum smelters. OPA says its modern technology will emit substantially less fluoride per ton of aluminum than older U.S. smelters. Its proposed permitting limit is 0.64 pounds of total fluoride per U.S. ton of aluminum produced.
The Inola smelter will be enormous. At OPA's planned production level, its own proposed permit ceiling works out to approximately 264 tons of fluoride compounds per year. A smelter can have a low emission rate per ton while still producing a large amount of pollution in total because it produces so much aluminum. For comparison, Norðurál's modern smelter in Iceland reported fluoride emissions of 0.34 kg per metric ton in 2025. At its 350,000-metric-ton permitted capacity, that rate would equal roughly 131 U.S. tons of fluoride per year. This illustrates the importance of looking at total annual emissions as well as emissions per ton. Fluoride also can move through several environmental pathways. The Agency for Toxic Substances and Disease Registry (ATSDR) is a federal public health agency within the U.S. Department of Health and Human Services and works closely with the CDC. Its job is to evaluate the health effects of exposure to hazardous substances and contaminated sites. ATSDR says hydrogen fluoride can be absorbed into rain, clouds and fog, while particulate fluorides can be removed from the air through wet and dry deposition onto land and surface water. 9. What air pollution concerns matter to people who don't farm or raise cattle? Fluoride's potential effects on vegetation, hay and livestock are important in rural areas, but regional air-quality concerns go well beyond agriculture. Fine particulate matter, or PM2.5, can penetrate deep into the lungs and can affect both the lungs and cardiovascular system. EPA links particle pollution with aggravated asthma, decreased lung function, respiratory symptoms, heart attacks and other health effects. Children, older adults and people with heart or lung disease are among the groups at greater risk. Ground-level ozone can cause coughing, shortness of breath and airway inflammation, and can aggravate asthma and other lung diseases. Children, people with asthma, older adults and people active outdoors are among those at greater risk. Nitrogen oxides and volatile organic compounds from industrial sources and power generation can react in sunlight to form ground-level ozone. 10. Why does ozone matter to Tulsa, Broken Arrow, Catoosa, Coweta and surrounding communities? The Tulsa metropolitan area already operates close to the federal ozone standard. Through November 8, 2026, the Tulsa area recorded nine ozone exceedance days in 2026. Its current three-year ozone design value is 0.070 ppm, which meets the federal standard but sits immediately below the 0.071 ppm level that constitutes a violation. Oklahoma DEQ says the state is currently designated in attainment with federal criteria-pollutant standards. That makes cumulative emissions important. OPA's preliminary modeling has placed the smelter's ozone impact just below the federal significant-impact threshold. The Attorney General's office described the estimate as within about 4% of that threshold. The proposed PSO power station near the Port would create an additional major source of nitrogen oxides and volatile organic compounds. Neither fact alone proves that the Tulsa region would violate the ozone standard. They do make careful cumulative air-quality analysis important in a region that already experiences ozone-exceedance days. 11. How far could smelter air pollution travel? There is no scientifically meaningful fixed radius. Pollution movement depends on stack height, emission rate, wind direction, wind speed, atmospheric stability, temperature, terrain and chemical reactions in the atmosphere. Some pollutants can travel many miles. Others deposit closer to their source. That is why air-permit review uses dispersion modeling rather than simply drawing a five-mile or 10-mile circle around a smelter. Residents of communities outside Inola therefore have a legitimate interest in the modeling assumptions and results. 12. What happens to wastewater from the smelter? OPA says it intends to recover and reuse most of the water entering the smelter and estimates that 5% to 8% of incoming water would leave as industrial wastewater. OPA says that wastewater will be pretreated at the smelter and then sent to the Tulsa Port of Inola wastewater system for additional treatment and disposal. The Port's existing wastewater planning calls for combined treated effluent to be piped approximately 1.5 miles south of the Port and discharged into the Verdigris River. The Port's long-range wastewater study was designed for up to 18.72 million gallons per day at full industrial-park buildout, including 6.6 MGD of non-cooling industrial wastewater and about 11 MGD of cooling water. OPA has not yet published a complete site water balance showing exactly how many gallons per day would enter the smelter. That makes its 5% to 8% figure impossible to convert into a precise OPA discharge volume today. An industry-based estimate is discussed in Question 15. 13. What pollutants could reach the Verdigris River even after treatment? Wastewater treatment is designed to reduce pollutants. It doesn't necessarily mean that every regulated pollutant is reduced to zero. Federal wastewater rules for primary aluminum smelting address different pollutants depending on the particular waste stream, including fluoride, aluminum, nickel, antimony, oil and grease, total suspended solids and benzo(a)pyrene. Some waste streams have zero-discharge requirements for particular pollutants while others have numerical limits. EPA's technical work on primary aluminum wastewater also identifies fluoride, suspended solids, oil and grease and other contaminants associated with smelting wastewater. A modern Icelandic smelter provides a useful real-world example. Norðurál monitors wastewater and drainage for fluoride, aluminum, suspended particles and oil or grease. The second pathway is through the air. ATSDR says hydrogen fluoride and particulate fluorides released into the atmosphere eventually deposit onto land or water through rainfall or dry deposition. Fluoride deposited on land can also reach surface water through runoff. Therefore, the river question involves both direct wastewater discharge and atmospheric deposition within the watershed. The actual concentrations reaching the Verdigris from OPA will depend on final permit limits, treatment design, operating performance, river flow and environmental conditions. 14. Why does this matter particularly to Broken Arrow? Broken Arrow's current primary raw-water source is the Verdigris River at the Adams Creek confluence. The city says this has been its raw-water source since 2014. Its Verdigris River Water Treatment Plant can produce roughly 30 million gallons per day of treated drinking water. Tulsa Ports' planned treated-effluent outfall is on the Verdigris at 36.097717, -95.558592. The Broken Arrow raw-water intake area is roughly two miles away in straight-line geography and only a few river miles downstream from the Port's proposed outfall. Broken Arrow has a direct interest in: -what pollutants OPA would send to the Port treatment system -the final discharge limits at the Port outfall -upstream monitoring -spill-response procedures -monitoring for fluoride, metals and other industrial contaminants -how Broken Arrow's treatment system would respond to unusual industrial releases Other communities in the region have different connections to the project. For Tulsa, Catoosa, Coweta and communities closer to Inola, air quality, ozone, electric-system costs and regional environmental effects may be more direct concerns than the specific Broken Arrow drinking-water pathway. 15. How much water might the smelter actually use and discharge? OPA hasn’t published enough site-specific information to answer this precisely. But an industry benchmark gives us a reasonable scale. The International Aluminium Institute reports an average water input for primary aluminum production of about 2.6 cubic meters per metric ton of aluminum, with net freshwater consumption of about 1.4 cubic meters per metric ton after water returned essentially unchanged is considered. Applied to a 750,000-metric-ton Inola smelter, that average would equal approximately: -1.95 million cubic meters of water per year -about 515 million gallons per year -about 1.4 million gallons per day of average water input If OPA's stated 5% to 8% wastewater figure were applied to that industry-average input, it would equal approximately 71,000 to 113,000 gallons of wastewater per day. Those numbers are an illustration, not OPA's published water requirement. Smelter water use varies enormously depending on cooling design. Norðurál's Iceland smelter, for example, reported only about 179,500 cubic meters of freshwater use in 2025, but its rectifier cooling system circulated about 7.9 million cubic meters of seawater. Inola obviously can’t duplicate a seawater cooling system. That’s why OPA should eventually provide a complete site water balance showing total withdrawals, water sources, cooling demand, recycling, evaporation and wastewater discharge. 16. What hazardous waste would the smelter generate? One of the best-known hazardous wastes from primary aluminum smelting is spent potliner. The carbon lining inside electrolytic pots eventually wears out and must be replaced. EPA classifies spent potliner from primary aluminum reduction as hazardous waste K088. K088 is EPA’s hazardous-waste designation for the spent carbon lining removed from aluminum reduction cells when the cells are rebuilt. The material can contain cyanide compounds, fluoride, metals and other contaminants and must be managed under federal hazardous-waste requirements. OPA says hazardous wastes would be managed under applicable federal and state requirements and transported to authorized off-site facilities. Questions worth tracking include how much K088 waste the Inola smelter would generate, how long it would be stored onsite, where it would be shipped and what backup arrangements will exist if disposal or recycling capacity became unavailable. 17. How much electricity would the smelter require? Century Aluminum CEO Jesse Gary has publicly described the power agreement being negotiated with PSO as approximately 1.2 gigawatts, or 1,200 megawatts. If that load operates continuously for a year, it will consume approximately 10.5 million megawatt-hours of electricity. For scale, published comparisons put that in the range of the electricity consumed by roughly 900,000 U.S. homes. Aluminum smelters require continuous power, so the issue is larger than simply connecting another industrial customer to the grid. Enough generation, transmission and fuel supply must be available to support that load reliably, even during PSO maintenance periods. 18. Is a new power station being proposed near the smelter? Yes. PSO has proposed the Inola Power Station, a natural-gas combined-cycle generating station near the Port with nominal capacity of about 1,282 MW. PSO's air-permit application for this Power Station calculates annual potential emissions including approximately: -390.5 tons of nitrogen oxides -123 tons of volatile organic compounds -200 tons of PM2.5 -68 tons of sulfur dioxide -5.26 million U.S. tons of greenhouse gases measured as CO2 equivalent The greenhouse-gas number is especially useful for understanding scale. Converting 5.26 million U.S. tons to metric tons and comparing it with EPA's estimate of 4.6 metric tons of annual CO2 emissions from a typical gasoline passenger vehicle works out to roughly the annual tailpipe CO2 emissions of one million passenger vehicles. The proposed power station would also emit NOx, VOC and particulate matter, pollutants relevant to regional ozone and respiratory health. 19. Could the smelter and new power infrastructure affect electric bills? There are two separate issues. On November 5, 2026, the Oklahoma Corporation Commission approved a PSO rate order that includes an overall 3.55% increase for residential customers. That was a broad PSO rate case involving grid investment, generation and other utility costs. The same OCC order created a new large-load tariff with separate rates, terms and conditions for customers using more than 75 MW. Regulators said the tariff is intended to protect residential customers from paying higher rates or interconnection costs caused by very large new customers. The proposed smelter's roughly 1,200-MW load would be about 16 times that 75-MW threshold. The remaining question is whether the eventual rate structure will fully assign the costs of new generation, transmission, substations, gas infrastructure and other investments needed for large-load customers to those customers. Critics of the recent rate decision remain concerned that some system costs associated with rapid large-load growth could eventually be shared with existing residential and small-commercial customers. The large-load tariff is intended to address that concern, but its effectiveness will depend on the final contracts, cost allocations and future OCC decisions. 20. How much public financial support is associated with the smelter? There isn't one useful grand-total number because the programs work differently and some overlap. The major pieces identified so far include: -U.S. Department of Energy: federal cost share of up to $500 million. DOE awarded $10 million for Phase 1 in January 2025. -Oklahoma ROA-25: $255 million of state principal is being placed into a financial structure designed to fund 15 annual manufacturer investment rebates. -Inola TIF districts: projected to generate up to $545 million in future property-tax, sales/use-tax and electric-franchise-fee increment. The plan identifies $429 million in project costs, including $270 million in development financing and $89 million in Port infrastructure. About $359 million, or 84%, of identified project costs go toward private development associated with the smelter or Port infrastructure supporting industrial development. -Manufacturing machinery and equipment sales/use-tax exemption: estimated in the 2025 state/EGA agreement at approximately $186 million. -Manufacturing energy sales/use-tax exemption: approximately $29 million. -Five-year manufacturing property-tax exemption: approximately $109 million. -Freeport inventory exemption: approximately $8 million per year. -Investment/New Jobs Tax Credit: approximately $155 million in projected Oklahoma income-tax offsets over 30 years. -Federal Section 45X production tax credit: qualifying primary aluminum can receive a credit equal to 10% of eligible U.S. production costs. Based on illustrative production costs, the benefit could be approximately $160 million-$200 million per full-rate year, although the credit begins phasing down after 2030 and ends after 2033. -Section 232 aluminum onshoring incentive: an approved U.S. expansion project can qualify for reduced tariffs on imported primary aluminum while new domestic capacity is being developed. Using Century's 40% share of the Inola project as an illustration, the tariff savings could be roughly $225 million-$262.5 million per year. -Proposed PSO power arrangement: the 2025 state/EGA agreement contemplated an estimated $16 million annual generation/transmission bond credit, an electricity-rate discount of up to 10%, and a long-term price hedge covering part of the smelter's power costs. The final PSO agreement is still being negotiated and would require regulatory approval. These programs include direct funding, tax credits and exemptions, redirected future tax revenue, tariff savings and potentially discounted electricity. Their timing and eligibility differ. THE ABOVE PROGRAMS TOTAL $2.172 BILLION DOLLARS IN SUBSIDIES. 21. What economic benefits are being promised? OPA projects: -at least 1,000 permanent direct jobs -approximately 4,000 construction jobs -average permanent compensation of about $100,000 -thousands of additional indirect and induced jobs across Oklahoma OPA's company-sponsored economic-impact study projects an average of about 7,000 Oklahoma jobs annually over the life of the project and approximately $1.45 billion in annual Oklahoma GDP contribution. These are economic projections. The appropriate public discussion is how those potential benefits compare with the public support, environmental impacts, infrastructure requirements and risks associated with the project.
THERE HAS BEEN NO STUDY OF JOB DESTRUCTION IN THE AGRICULTURAL MARKETS. 22. What legal and local decisions are still unresolved? Several important proceedings remain active. Oklahoma Attorney General Gentner Drummond filed a state-law lawsuit seeking to block the smelter. The case was returned from federal court to Rogers County District Court in September 2026, where it continues. The Town of Inola has a heavy-industrial development moratorium in place through April 7, 2027. On that date, eligible Town of Inola voters are scheduled to decide a citizen initiative that would prohibit primary aluminum smelting within town limits. Separate litigation involving Tulsa Ports and the Town also challenges local restrictions related to development at the Port. Meanwhile, the DEQ permitting process continues independently. 23. What can residents of surrounding communities do now? People don’t have to live inside Inola to participate in state and federal environmental and utility proceedings. Residents can: -Follow ODEQ's official Inola smelter page and sign up for updates. -Review OPA's air-permit application and DEQ correspondence rather than relying solely on statements from either supporters or opponents. -Participate in formal public-comment periods and public meetings. -Follow future water-discharge, stormwater and waste permits. -Follow Oklahoma Corporation Commission proceedings involving OPA's power contract, PSO's Inola Power Station and large-load rate treatment. -Ask Broken Arrow officials and water-system managers how they plan to monitor industrial discharges upstream of the city's Verdigris raw-water intake. -Ask officials in Tulsa, Catoosa, Coweta and other surrounding communities to review the regional air-quality implications, particularly ozone and particulate pollution. -Ask for cumulative analysis that considers the smelter together with new power generation and other large industrial development in the region. -ODEQ currently lists future technical meetings covering Best Available Control Technology and dispersion modeling, followed by a draft air-permit public meeting. Dates have not yet been announced. 24. Where can I get information directly from the sources? Oklahoma DEQ — Proposed Inola Aluminum Smelter Official permit documents, technical correspondence, meeting information and public-participation opportunities. ODEQ Inola Smelter Project Oklahoma Primary Aluminum — Answers Center The smelter developer's explanations of emissions, water, jobs, ownership and other issues. OPA Answers Center Broken Arrow — Verdigris River Water Treatment Plant Information on Broken Arrow's drinking-water treatment system. Broken Arrow Water Treatment Information Tulsa Area Air Quality Current regional ozone monitoring and annual scorecards. Tulsa Air Quality PSO Rates and Tariffs Current PSO tariff documents, including the November 2026 tariff package. PSO Rates and Tariffs The key point for surrounding communities is simple. This isn't only an Inola zoning question. The decisions now being made involve a major regional air-emissions source, treated industrial wastewater entering a river used for drinking water downstream, one of the largest proposed electric loads in Oklahoma, a new 1,282-MW natural-gas power station, and substantial public financial support. These decisions deserve attention from communities well beyond Inola.